Vopak - Hazardous Chemical

Tanks Repairs & Shutdowns, Scaffolding & Access, Coatings & Abrasive Blasting,

VOPAK

Port Botany

"All projects were completed before due date and within budget"

  • Several projects were undertaken where by Giovenco Industries supplied and erected scaffold for both the pipe rack work and 4 tanks in site B. Both projects required High Pressure Water Washing, Abrasive Blasting and a Priming and then 2 full additional coats of paint.
  • Mechanical works were carried out on Tank 624 where by the internal pontoon was unbolted and removed, abrasive blasted and painted off site in our Ingleburn facility and then reinstalled back onto site. Fire Hydrant spools were fabricated and installed on site
  • The introduction of the Falcon Quill System which enables both the water blasting and abrasive blasting at the same time. This created a dust free environment and allowed the projects to be completed on time and within budget. The client was impressed by this introduction and has requested future work using the Falcon Quill


VOPAK

Location: Port Botany

Date: 2012 - Ongoing

Industries: Oil & Gas,

Capability Sectors: Tanks Repairs & Shutdowns, Scaffolding & Access, Coatings & Abrasive Blasting,