BOC Vessels - Syd Workshop

Coatings & Abrasive Blasting,

BOC

Ingleburn Workshop

"With exceptional planning and the help of an afternoon shift, both tanks were completed a full month ahead of schedule"

  • The job involved an internal blast and external blast and paint. Full blast and paint on the externals with a Three coat paint system and full blast on internal
  • The 2 bullet tanks arrived with transport company Rex Andrews from L&A Pressure Welding. Weighing in at 90 tonne each, it was a big move to get them here.
  • Delivery of the tanks were one week apart allowing work to get well under way on the first vessel when the second one arrived.
  • Using an hydraulic jacking system supplied from Rex Andrews Transport, the tanks were reversed into the workshop and jacked onto stands so we could perform our blasting and painting.
  • With exceptional planning and the help of an afternoon shift, both tanks were completed well ahead of schedule, despite a strict inspection process.


BOC

Location: Ingleburn Workshop

Date: 4 weeks 2012

Industries: Oil & Gas, Workshops,

Capability Sectors: Coatings & Abrasive Blasting,

Download Poject Sheet (PDF)